2012 Home Renovations – Part 14 -Backfill of pool retaining wall complete
Continuing along at our rapid-fire pace, back fill and leveling around the pool has been completed. The French drain was installed behind the lanai retaining wall and the gap there was back filled and tamped The back yard has been recontoured into pretty much its final configuration. There will be a bit more done once … Continue reading 2012 Home Renovations – Part 14 -Backfill of pool retaining wall complete
