2012 Home Renovations – Part 14 -Backfill of pool retaining wall complete

Continuing along at our rapid-fire pace, back fill and leveling around the pool has been completed.

The French drain was installed behind the lanai retaining wall and the gap there was back filled and tamped

The back yard has been recontoured into pretty much its final configuration. There will be a bit more done once work is completed on the cement slab next to our shed. The dirt will be sloped up a bit both at the shed and at the retaining wall that is front and center in this picture below. The idea is to help encourage water AWAY from those areas to be guided away by both the slope behind the retaining wall and by the French drain to the catch basins that were put in near the beginning of this project and then out to the front yard and street.

The hill that used to be in front of the shed has been largely leveled. We have opted to replace the originally planned stairs that were to lead up to the shed with a low incline ramp that will run from the beginning of the retaining wall (part closest to us in the picture below) and ending even with the remainder of the legacy slab near the middle of the picture. The yard to the right will be contoured to butt up against this ramp and match its incline.

For contrast here is how the yard looked before. Basically it was a steeper, shorter ramp up with a more significant hill beginning closer to the house.

And we continue to make significant inroads into our “Dirt Everest” in the front yard.

In the beginning, Michelle was hoping that we would find some significant boulders so we could pull them out to use as show pieces. I don’t think she realizes how fine a line it is between “cool boulders” and “immovable objects that will mess up your project”. But she was thrilled that one was found and put where she can evaluate what to do with it. It’s pictured here just right of center, somewhat framed by more rubble from the driveway and the pile of gravel that is being used for the French Drains.

2012 Home Renovations – Part 13 – Backfill has begun Electrics have begun

2012 Home Renovations – Part 15 – Rest of driveway by house removed, Electrical, Gas and Water Returns in place

Leave a Reply

Your email address will not be published. Required fields are marked *