2012 Home Renovations – Part 28 – Screening of Lanai Done

Another incremental day. I’m pleased to say that you can’t really tell that the screening has all been installed 🙂

You *can* see the chair rails and the doors are now all fully operational.

This first shot below is still waiting for the Lexan covering for the roof. This small part will not be screened so that I can (finally) bar-b-que unmolested by the rain.

The screen on the roof is a heavier grade than that used for the sides so it is more visible (the oblique angle doesn’t hurt either). It can support real weight. I think we can do up to 6 inches of snow should it ever come to that.

The pool heater with auxiliary filter and booster pump were hooked up

and here we have the beginnings of our control center for the pool.  Top is the Jandy controller, below that the Aqualink controller (controls EVERYTHING and can be accessed via iPad, Android and web interface). Below that is the hydraulic pump that will power the Fastlane.

This picture below was taken as a “before” picture to highlight the ceiling fans that we will be replacing with…

this nice fan we found on Amazon (Minka Aire F574-ORB Concept II Wet Bronze Outdoor Flush Mount 52" Ceiling Fan w Light & Ctrl).

2012 Home Renovations – Part 27 – Framework for Lanai is largely done

2012 Home Renovations – Part 29 – Driveway Demolition, New Door, Window Gone

Leave a Reply

Your email address will not be published. Required fields are marked *