2012 Home Renovations – Part 26 – Lanai parts have arrived

A bit earlier than expected (almost always a good thing in construction) was this trailer load of pieces that will eventually make up our lanai.

There was a fair amount of relatively invisible work done installing the anchors around the deck and on the retaining wall. The most visible piece is the large support that will hold up the two separate peaked portions of the lanai.

You can see it here upper right (big dark brown – bronze – beam over the ladder)

and here upper left

But it’s best seen in overvier

As a reminder, the finished lanai is supposed to look like this from the outside

and like this from the inside

2012 Home Renovations – Part 25 – Rock Face completed

2012 Home Renovations – Part 27 – Framework for Lanai is largely done

One thought on “2012 Home Renovations – Part 26 – Lanai parts have arrived”

Leave a Reply

Your email address will not be published. Required fields are marked *