Things are definitely tapering off. For the past few work days there hasn’t been much to see, prep work doesn’t show too well. Plus we’ve had Tommy and Larry do a bunch of smaller things that have been on my “to do” list for ages. But it’s hard to show you the great improvement that shoring up (and properly sealing) the window air conditioner on the gym makes. Or how much nicer the outside of the house looks now that it’s been powerwashed and that scuff on the garage door frame and the fading chimney cap have been painted.
But today there were some more dramatic updates. The wallpaper is now up in the guest bathroom
and over the bathtub tiles
and the lighting has been installed for over the mirror
and the cabinets have been painted and new drawer pulls and cabinet door knobs installed
We’re waiting on the counter, we’re told it should be ready for next Wednesday (6/20).
Below is the next day – I guess I’m getting lazy but the only very visible thing to see is that the medicine cabinet is now installed and the shower doors are back up (and CLEAN too!)